High-Density Foam System
- Density (Free Rise)
- ASTM D1622, 3.10 lbs/ft3 (50 kg/m3)
- K-Factor (Initial)
- ASTM C518, 0.164 BTU∙inch/ft2∙h∙°F
- R-Value (Initial)
- ASTM C518, 6.5 at 1 inch thickness
- R-Value (Aged 90 days @ 140°F)
- 5.2 at 1 inch thickness
- Compressive Strength
- ASTM D1621, 40 lbf/in2 (275 kPa) Parallel
- Dimensional Stability
- ASTM D2126, +/- 5%
- Tack-Free Time
- 30-60 seconds
- Closed-Cell Content
- ASTM D2856, 95%
- Cuttable
- 2-5 minutes
- Tensile Strength
- ASTM D1623, 40 lbf/in2
- Fire Rating (@ 2" thickness)
- ASTM E84, Flame Spread Index 15, Smoke Developed 450
- Permeability (@ 1" thickness)
- ASTM E96, 1.37 Perms - Class III Vapor Retarder
- Permeability (@ 2" thickness)
- 1.19 Perms - Class III Vapor Retarder
- Water Vapor Transmission (@ 1" thickness)
- ASTM E96, 0.39 g/hr∙m²
- Water Vapor Transmission (@ 2" thickness)
- 0.34 g/hr∙m²
- VOC Content
- EPA Method 24 (Calculated), <25 g/L (when mixed as intended)
- Fungi Resistance
- ASTM G21, No growth
- Cell Structure
- 95% closed cell content
- Cure Time
- 1 hour
- Surface Preparation
Ensure the substrate is clean, dry, and free of contaminants. Metal surfaces must be free of oil and rust. Primers may be required for certain substrates.
- Mixing/Equipment Setup
Use a 1:1 proportioning pump designed for SPF. Precondition materials to 70°F–85°F before spraying. Dispensing temperature should be 130°F for optimal performance.
- Application Methods
Apply with a plural-component spray system. Available in fast, regular, and slow reactivity speeds to suit ambient conditions. Ensure uniform thickness and proper overlap adhesion.
- Coverage Rates
Thickness varies by R-value requirements and warranty specs. Standard applications range from 1 to 4 inches, with an R-value of 6.3 per inch.
- Cure Time
Tack-free in seconds, fully cured in 24 hours under normal conditions. Cure times depend on temperature, humidity, and reactivity speed.
- Limitations/Precautions
Do not apply below 50°F unless using a low-temp formula. UV protection required post-application to prevent degradation. Keep materials dry, as moisture can affect performance.
- Storage/Handling
Store at 70°F–85°F in a sealed container. The B-side drum must be kept under dry air or nitrogen (2-3 psi) after opening. A-side shelf life 24 months. B-side shelf life is 6 months.
- Cleanup/Disposal
Clean equipment with approved solvents immediately after use. Dispose of materials per local, state, and federal regulations.

